The engineer came about 90 minutes before he was supposed to, so I completely missed going into the house with him. Also, he woke up the chemo ridden owner.
His biggest thing was the lack of banisters. Since the house is 4 subfloors, we'll decide if we want to put them in. right now, the stairs are between walls so they're narrow already.
He also found a drip in the wall behind the tiles in the bathroom. On the other hand, when we checked their water meter which is super sensitive - even to leaky faucets - it wasn't moving.
Their neighbors recently found a leak in the wall (same wall is shared) so it's possible he was picking up that leak. His moisture meter said it was a teensy one so we're not worrying about it for now.
No comments:
Post a Comment